Condenser Units Platform
MONASH UNIVERSTY CLAYTON
Structural, Access
New platform for condenser units with access stairs & facade. Site measured for modifying existing building & coordinating with other trades. Fabrication, install & as built drawings:
- Structural Steel (~50 t)
- New Condenser units (~50 t)
New Rail Carriage
ALSTOM
Structural, Mechanical Design
Operator controlled, hydraulically driven, train mover. Complete with access walkways, step ladders, control station, canopies & driven ramps.
- Tare Weight : 35 t
- WLL : 90 t
KOSS Kindergarten
GROVE
Structural
8x pre-fabricated modular Kindergarten
buildings. Shop drawings:
- Structural Steel (~50 t each)
Yan Yean WTP Upgrades
MELBOURNE WATER
Structural, Piping, Civil
Access Platforms, Stairs & Ladders, Pressure Piping, Equipment, Cradles & Supports including:
- Structural Steel (~22 t)
- MSCL Pipe to AS 1579 (~20 t)
- DICL Pipe to AS/NZS 2280 (~8 t)
- S/S Pipe to ASTM A312M (~5 t)
- Steel Pipe to API 5L (~1 t)
Conveyors, Supports & Access
RIDLEY AGRIPRODUCTS LARA
Mechanical, Structural, Access
Upgrade existing conveyor system to increase capacity. Concept, fabrication & install drawings:
- Conveyor System 200t/hr
- 3x Chain drag conveyors
- 2x Screw Conveyors
- Structural Steel (~35 t)
Gapuwiyak Tank Stand
DELTA GROUP
Structural, Access
Elevated Water Tank 18m tall for adequate gravity pressure for the local community located in East Arnhem Land in the NT.
- Steel (~35t)